I learned a lot from creating the concrete base for the A/C unit. I used that to make the new base for the pump house that will house the electric and the water facilities/infrastructure. Here are some pics of the work I did.
I placed a pressure treated piece of 2 x 4 with a 12" piece nailed to the bottom so it would stand up. Then I tied the direct burial wire for the power to the pump house right to the 2 x 4. Later I will use that to provide power to the water pump.
Here you can see the water junction and the power cable a bit better. I believe I used 12 and 1/2 bags of 80 lb of concrete.